Tuesday, 14 May 2013

http://bindupromoters.com/new-launches/

Ongoing Project

Builders and Promoters in Rajajinagar

Bindu Amulya Phase 2
Scheduled Completion in 2014
No. Of flats 140
Location: Magadi Main road, Anjananagar, Bangalore
Amenities Car parking, GYM, Children's play area

Read More….
ImgBindu Aditya Rajajinagar
Completed 2005
No. Of Flats 96
Location: Vijaynagar
Amenities carparking, GYM, Swimming pool, Children's play area

Read More….
Img
Bindu Adishwar Okalipuram
Completed 2003
No. Of flats 32
Location: Rajajinagar Amenities car parking

Read More….
ImgBindu Industrial Estate
Completed 2006
No. Of flats 32
Location: Malleshwaram Amenities car parking

Read More….
Img
On going project / ready to occupy
Bindu Amulya
Total land area 2.5 acres
Total flats no 280
Phase 1 Completed, shortly launching Phase 2
No. Of flats 140
Location BEL layout, Magadi Road

Amenities: car parking, joggers track, swimming pool in the terrace, GYM, STP, Rain water harvesting, water softening plant., No common walls 3D ventilation, around the clock security and intercom facilities 100% vastu, Jain and Ganesh temple(completion in April), Surrounded with lot of greenery, easy access to nice road and ring road, surrounded with good schools and colleges,
STRUCTURE :Seismic zone II Resistant R.C.C Frame Structure with Anti-Termite Treatment for the entire Plinth.
WALLS :External & internal walls of compressed concrete solid blocks masonry with cement mortar.
PLASTER :External walls cement plaster with sponge finish & internal walls with lime rendering smooth finish.
FLOORING :Designer premium vitrified tiles flooring in living, Dinning, Bedroom& Kitchen. Ceramic tiles for utility, Balcony& Bathrooms, Lobby and staircase will be finished with Kota-Stones.
DOORS :Main door teak wood frame with OST paneled Shutters, All internal door frames of natural wood with flush door, ALL external balcony/utility Doors windows of Natural wood with flush door.
WINDOWS :Anodized Aluminum sliding windows with glass & safety grills.
KITCHEN :Highly polished granite platform with stainless steel sink, Ceramic tile dadooing up to 4 feet above the platform & separate point for water purifier, Refrigerator &cooking range, Separate water &electric points for washing machine in the utility.
TOILET :Glazed /Ceramic tile dadooing up to false ceiling with branded sanitary wares &C.P fixtures & provision for geyser in all Toilets.
PAINT & POLISHING :Acrylic OBD for all internal walls & Cement paints for external walls &enamel paints for grills, railings & flush doors, Teak surface provide with melamine polished.
ELECTRICAL :Concealed electrical wiring with copper conductors & designer modular switches with miniature circuit breakers (MCB), & Provision for exhaust fan in kitchen &toilets, T.V & telephone points in living rooms &Master Bedrooms, Split A.C point in Master Bedroom &UPS point.
PARKING :Existing level of site used for parking on ownership basis with demarcated visitors parking & ample setback.
LIFT :8 nos of VVVF Computerized elevators of 6 Passengers each.
SECURITY :Round the clock security service at the parking level with intercom system connecting all flats to other flats, club house and to the security office with fire fighting systems.
POWER BACKUP :100% generator backup for lift-common areas and other essential services and one lighting point in each flat.
WATER SUPPLY :Bore wells to supplement corporation water supply with water softening treatment plant. Rain water harvesting &waste water treatment plant washing area and Servants/Drivers toilets at parking level.

No comments:

Post a Comment